Construction management is all about keeping projects on track and within budget. Cost estimation and budgeting are crucial skills for civil engineers to master. They help predict expenses, allocate resources, and ensure projects stay financially viable.

From to earned value analysis, various techniques help engineers plan and control costs. Understanding these methods, along with factors affecting construction costs, enables better decision-making and more successful project outcomes.

Project Budget Development

Cost Estimation Techniques

Top images from around the web for Cost Estimation Techniques
Top images from around the web for Cost Estimation Techniques
  • Analogous estimating utilizes historical data from similar projects to estimate costs for the current project
    • Adjusts for differences in scope and complexity
    • Example: Using cost data from a previous office building project to estimate costs for a new office complex
  • calculates cost estimates using statistical relationships between historical data and other variables
    • Example: Estimating cost per square foot based on historical data for similar building types
  • breaks down the project into smaller components and estimates the cost of each individual element
    • Provides a detailed and accurate estimate
    • Example: Estimating costs for foundation, framing, electrical, plumbing, and finishing separately
  • calculates a weighted average cost using optimistic, most likely, and pessimistic estimates
    • Formula: (O+4M+P)/6(O + 4M + P) / 6 where O = optimistic, M = most likely, P = pessimistic
    • Example: Estimating concrete costs with 8000(O),8000 (O), 10,000 (M), and $14,000 (P)

Project Structure and Cost Aggregation

  • provides a hierarchical decomposition of project deliverables
    • Serves as a foundation for cost estimation
    • Organizes project elements into manageable components
    • Example: Breaking down a house construction project into foundation, framing, roofing, and finishing
  • combines cost estimates of lower-level components to obtain higher-level cost estimates
    • Rolls up individual cost estimates to create the overall project budget
    • Example: Summing up costs for all subcontractors to determine total construction cost

Construction Cost Factors

Material and Labor Costs

  • fluctuate based on market conditions, supply chain dynamics, and quantity discounts
    • Example: Steel prices affected by global demand and tariffs
  • vary depending on skill level, experience, union agreements, and local wage rates
    • Example: Electricians commanding higher wages than general laborers
  • encompass purchase or rental fees, maintenance, fuel, and operator expenses
    • Example: Crane rental costs including daily rate, operator salary, and fuel consumption

Project-Specific Factors

  • impacts costs through site accessibility, local regulations, and regional price variations
    • Example: Higher costs for remote locations due to transportation and lodging expenses
  • and unique design features significantly influence overall construction costs
    • Example: Custom-designed facades increasing material and labor costs
  • and scheduling requirements may lead to increased costs
    • Result in overtime pay or expedited material deliveries
    • Example: Accelerated schedule requiring night shifts and weekend work

Economic Considerations

  • Economic factors affect long-term project costs
    • Inflation rates impact material and labor costs over time
    • Market volatility can lead to price fluctuations
    • Example: Multi-year projects factoring in annual cost escalation rates

Project Change Impact on Costs

Change Management Processes

  • formally modify the original scope, time, or cost of a project contract
    • Document agreed-upon changes between client and contractor
    • Example: Adding a floor to a building design after construction has begun
  • of changes impacts multiple aspects of a project
    • Potentially leads to cost overruns and schedule delays
    • Example: Changing window specifications affecting wall framing and HVAC systems
  • manage and document project modifications and their cost implications
    • Establish a systematic approach to evaluating and approving changes
    • Example: Using a change request form to document proposed changes and their estimated costs

Cost Analysis and Risk Management

  • identifies cost-effective alternatives without compromising project quality or performance
    • Systematic approach to optimizing project value
    • Example: Substituting a less expensive flooring material with similar durability and aesthetics
  • cover unforeseen events or known risks that may impact project costs
    • Typically calculated as a percentage of the total project budget
    • Example: Setting aside 5% of the budget for unexpected site conditions
  • evaluates the financial impact of proposed changes against potential benefits
    • Helps in making informed decisions about implementing changes
    • Example: Analyzing the long-term energy savings of upgrading to a more efficient HVAC system

Performance Measurement Techniques

  • assesses the impact of changes on project performance and cost projections
    • Integrates scope, schedule, and cost data
    • Key metrics include and
    • Example: Using EVM to determine if a project is over budget or behind schedule after implementing changes

Cost Control Effectiveness

Cost Tracking and Analysis

  • serves as the approved time-phased budget for project cost control and performance measurement
    • Establishes a reference point for comparing actual costs
    • Example: Using S-curve to visualize planned vs. actual cumulative costs over time
  • compares actual costs to budgeted costs to identify discrepancies and their root causes
    • Helps in early detection of cost overruns
    • Example: Identifying higher-than-expected material costs due to market fluctuations
  • and forecasting enable informed decision-making and corrective actions
    • Provides visibility into project financial health
    • Example: Monthly cost reports highlighting areas of concern and potential savings

Performance Measurement and Forecasting

  • for cost control include Cost Performance Index (CPI) and Schedule Performance Index (SPI)
    • CPI = Earned Value / Actual Cost
    • SPI = Earned Value / Planned Value
    • Example: CPI of 0.9 indicating the project is overspending by 10%
  • measures project performance and progress objectively
    • Integrates scope, schedule, and cost metrics
    • Example: Using EVA to forecast final project cost based on current performance trends

Long-term Cost Considerations

  • considers the total cost of ownership
    • Includes initial construction costs, operational costs, and maintenance expenses
    • Helps in making decisions that optimize long-term value
    • Example: Choosing a more expensive but energy-efficient HVAC system to reduce operational costs
  • Implementation of cost control software and tools enhances accuracy and efficiency in tracking and managing project costs
    • Provides real-time data and automated reporting capabilities
    • Example: Using project management software to track expenses, generate reports, and forecast costs
© 2024 Fiveable Inc. All rights reserved.
AP® and SAT® are trademarks registered by the College Board, which is not affiliated with, and does not endorse this website.


© 2024 Fiveable Inc. All rights reserved.
AP® and SAT® are trademarks registered by the College Board, which is not affiliated with, and does not endorse this website.

© 2024 Fiveable Inc. All rights reserved.
AP® and SAT® are trademarks registered by the College Board, which is not affiliated with, and does not endorse this website.
Glossary
Glossary